Nitrogen removal from coke making wastewater through a pre-denitrification activated sludge process
Date published
Free to read from
Supervisor/s
Journal Title
Journal ISSN
Volume Title
Publisher
Department
Type
ISSN
Format
Citation
Abstract
Under the Industrial Emissions Directive (IED), coke production wastewater must be treated to produce an effluent characterised by a total nitrogen (TN) <50 mg/L. An anoxic-aerobic activated sludge pilot-plant (1 m3) fed with coke production wastewater was used to investigate the optimal operational requirements to achieve such an effluent. The loading rates applied to the pilot-plant varied between 0.198–0.418 kg COD/m3.day and 0.029–0.081 kg TN/m3.day, respectively. The ammonia (NH4+-N) removals were maintained at 96%, after alkalinity addition. Under all conditions, phenol and SCN− remained stable at 96% and 100%, respectively with both being utilised as carbon sources during denitrification. The obtained results showed that influent soluble chemical oxygen demand (sCOD) to TN ratio of should be maintained at >5.7 to produce an effluent TN <50 mg/L. Furthermore, nitrite accumulation was observed under all conditions indicating a disturbance to the denitrification pathway. Overall, the anoxic-aerobic activated sludge process was shown to be a robust and reliable technology to treat coke making wastewater and achieve the IED requirements. Nevertheless, the influent to the anoxic tank should be monitored to ensure a sCOD:TN ratio >5.7 or, alternately, the addition of an external carbon source should be considered.