Analysis of a 115MW, 3 shaft, helium Brayton cycle

Date published

2002-07

Free to read from

Supervisor/s

Pilidis, Pericles
Tourlidakis, A.

Journal Title

Journal ISSN

Volume Title

Publisher

Cranfield University

Department

Type

Thesis or dissertation

ISSN

Format

Citation

Abstract

This research theme is originated from a development project that is going on in South Africa, for the design and construction of a closed cycle gas turbine plant using gas-cooled reactor as the heat source to generate 115 MW of electricity. South African Power utility company, Eskom, promotes this developmental work through its subsidiary called PBMR (Pebble Bed Modular Reactor). Some of the attractive features of this plant are the inherent and passive safety features, modular geometry, small evacuation area, small infrastructure requirements for the installation and running of the plant, small construction time, quick starting and stopping and also low operational cost. This exercise is looking at the operational aspects of a closed cycle gas turbine, the finding of which will have a direct input towards the successful development and commissioning of the plant. A thorough understanding of the fluid dynamics in this three-shaft system and its transient performance analysis were the two main objectives of this research work. A computer programme called GTSI, developed by a previous Cranfield University research student, has been used in this as a base programme for the performance analysis. Some modifications were done on this programme to improve its control abilities. The areas covered in the performance analysis are Start-up, Shutdown and Load ramping. A detailed literature survey has been conducted to learn from the helium Turbo machinery experiences, though it is very limited. A critical analysis on the design philosophy of the PBMR is also carried out as part of this research work. The performance analysis has shown the advantage, disadvantage and impact of various power modulation methods suggested for the PBMR. It has tracked the effect of the operations of the various valves included in the PBMR design. The start-up using a hot gas injection has been analysed in detail and a successful start region has been mapped. A start-up procedure is also written based on this. The analysis on the normal and emergency load rejection using various power modulation devices has been done and it stress the importance of more control facilities during full load rejection due to generator faults. A computational fluid dynamics (CFD) analysis, using commercial software, has been carried out on some geometry of the PBMR design to find out whether its flow characteristic will have any serious impact on the performance on the cycle during the load control of the plant. The analysis has demonstrated that there will not be much impact on the performance, during load control using pressure level changes, from this geometry. However, some locations in the geometry have been identified as areas where the flow is experiencing comparatively high pressure losses. Recommendations, which include modification in the physical design, were made to improve this. The CFD analysis has extended to a cascade to compare the flow behaviour of Air and Helium with an objective of using air, being inexpensive, to test the helium flow characteristic in a test rig to simulate the behavioural pattern of helium in the PBMR pressure vessel. The specification of a hypothetical test rig and the necessary scaling parameters has been derived from this exercise. This will be useful for designing test rigs during the developmental and operational stage of the PBMR project.

Description

Software Description

Software Language

Github

Keywords

DOI

Rights

Relationships

Relationships

Supplements

Funder/s