Comparison of lifing results of gas turbine operated in base load and as a back up to wind turbine

dc.contributor.authorMohamed, Saleh
dc.contributor.authorAli, Ezeddin
dc.contributor.authorPilidis, Pericles
dc.contributor.authorSampath, Suresh
dc.date.accessioned2020-01-31T12:30:33Z
dc.date.available2020-01-31T12:30:33Z
dc.date.issued2019-04-30
dc.description.abstractWhen operating the gas turbine in a flexible mode as a back up to renewable energy sources such as wind, solar, tidal and so on. A fluctuation of power produced by the GT will be apparent which in turn will cause low cycle fatigue in the high-pressure turbine blades. The drive behind this study is to estimate the life of a 100 MW GT operated in a baseload scenario and compare the lifing results with two different scenarios of operating the GT as a back up to a wind turbine operated in the UK in 2016. For the estimation of the GT lifing, some performance parameters are essential such as turbine entry temperature (TET), blade cooling temperature (Tc), and the shaft rotational speed (PCN). All these parameters are obtained from running the in-house TURBOMATCH model, which was developed in Cranfield University, under certain operating conditions (temperature and pressure). These values are used with other parameters as input to a FORTRAN code to estimate the lifing and lifing consumption of the GT. In comparison, it was found that the base load scenario has the highest value of creep while in the backup scenarios the LCF was higher due to the power fluctuation.en_UK
dc.identifier.citationMohamed S, Ali E, Pilidis P, Sampath S. (2019) Comparison of lifing results of gas turbine operated in base load and as a back up to wind turbine. International Journal of Research in Engineering and Science (IJRES), Volume 7, Issue 1, 2019, pp. 44-54en_UK
dc.identifier.issn2320-9356
dc.identifier.urihttps://www.ijres.org/papers/Volume%207/Issue-1/Series-1/G0701014454.pdf
dc.identifier.urihttps://dspace.lib.cranfield.ac.uk/handle/1826/15059
dc.language.isoenen_UK
dc.publisherIJRESen_UK
dc.subjectGas Turbinesen_UK
dc.subjectFlexibilityen_UK
dc.subjectWind Energyen_UK
dc.subjectCreepen_UK
dc.subjectFatigueen_UK
dc.subjectLiftingen_UK
dc.titleComparison of lifing results of gas turbine operated in base load and as a back up to wind turbineen_UK
dc.typeArticleen_UK

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Comparison_of_lifing_results_of_gas_turbine_operated_in_base_load-2019.pdf
Size:
650.5 KB
Format:
Adobe Portable Document Format
Description:
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.63 KB
Format:
Item-specific license agreed upon to submission
Description: