Development of a whole life cycle cost model for electrification options on the UK rail system

dc.contributor.authorKirkwood, Leigh
dc.contributor.authorGiuntini, L.
dc.contributor.authorBaguley, Paul
dc.date.accessioned2016-08-19T13:11:49Z
dc.date.available2016-08-19T13:11:49Z
dc.date.issued2016-06-13
dc.description.abstractProjects to deliver Overhead Line Equipment (OLE) electrification on the UK rail infrastructure system presents technical challenges which the rail industry in Britain have not traditionally had to consider. Whole Life Cycle assessment provides decision makers with cost estimates for the installation phase and over the entire service life of the system, including disposal. The OLE projects face a particular problem when analysing the best option for overbridges. Much of the rail infrastructure has not traditionally had to consider overhead clearances and therefore many of the bridges are only a little taller than the rolling stock. In addition to the difficulties in assessing the Life-Cycle costs of assets that have historically been used in very limited scales, the Whole Life Cycle assessment must consider the various engineering options that are available for projects. The three competing options (bridge rebuild, track lowering, reduced clearance) are all going to have very different capital expenditure (CAPEX) and operating expenditure (OPEX) costs. This work presents a model created to predict these costs over the anticipated assessment period. The developed model predicts capital expenditures, maintenance and service disruption costs and links them to the three major assets options involved in OLE underbridges.en_UK
dc.identifier.citationL. Kirkwood, L. Giuntini, E. Shehab, P. Baguley, Development of a whole life cycle cost model for electrification options on the UK rail system, Procedia CIRP, Volume 47, 2016, Pages 1-5en_UK
dc.identifier.issn2212-8271
dc.identifier.urihttp://dx.doi.org/10.1016/j.procir.2016.03.067.
dc.identifier.urihttps://dspace.lib.cranfield.ac.uk/handle/1826/10364
dc.language.isoenen_UK
dc.publisherElsevieren_UK
dc.rightsAttribution 4.0 Internationalen_UK
dc.rights.urihttp://creativecommons.org/licenses/by/4.0/
dc.subjectWhole life cycleen_UK
dc.subjectRail maintenanceen_UK
dc.subjectOLEen_UK
dc.subjectCosten_UK
dc.titleDevelopment of a whole life cycle cost model for electrification options on the UK rail systemen_UK
dc.typeArticleen_UK

Files

Original bundle
Now showing 1 - 1 of 1
Loading...
Thumbnail Image
Name:
Development_of_a_Whole_Life_Cycle_Cost_Model_for_Electrification_options_on_the_UK_Rail_System_2016.pdf
Size:
234.56 KB
Format:
Adobe Portable Document Format
License bundle
Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.79 KB
Format:
Item-specific license agreed upon to submission
Description: