Simulation and Optimization of Integrated Maintenance Strategies for an Aircraft Assembly Process

Show simple item record

dc.contributor.advisor Sreenuch, Tarapong
dc.contributor.advisor Tsourdos, Antonios
dc.contributor.author Li, Jin
dc.date.accessioned 2014-05-08T16:24:38Z
dc.date.available 2014-05-08T16:24:38Z
dc.date.issued 2013-11
dc.identifier.uri http://dspace.lib.cranfield.ac.uk/handle/1826/8439
dc.description.abstract In this thesis, the COMAC ARJ21 fuselage’s final assembly process is used as a case study. High production rate (i.e. number of aircraft assembled per year) with reasonable cost is the overall aim in this example. The output of final assembly will essentially affect the prior and subsequent processes of the overall ARJ21 production. From the collected field data, it was identified that a number of disruptions (or bottlenecks) in the assembly sequence were caused by breakdowns and maintenance of the (semi-)automatic assembly machines like portable computer numerical control (CNC) drilling machine, rivet gun and overhead crane. The focus of this thesis is therefore on the maintenance strategies (i.e. Condition-Based Maintenance (CBM)) for these equipment and how they impact the throughput of the fuselage assembly process. The fuselage assembly process is modelled and analysed by using agent-based simulation in this thesis. The agent approach allows complex process interactions of assembly, equipment and maintenance to be captured and empirically studied. In this thesis, the built network is modelled as the sequence of activities in each stage. Each stage is broken down into critical activities which are parameterized by activity lead-time and equipment used. CBM based models of uncertain degradation and imperfect maintenance are used in the simulation study. A scatter search is used to find multi-objective optimal solutions for the CBM regime, where the maintenance-related cost and production rate are the optimization objectives. In this thesis, in order to ease computation intensity caused by running multiple simulations during the optimization and to simplify a multi-objective formulation, multiple Min-Max weightings are applied to trace Pareto front. The empirical analysis reviews the trade-offs between the production rate and maintenance cost and how these objectives are influenced by the design parameters. en_UK
dc.language.iso en en_UK
dc.publisher Cranfield University en_UK
dc.rights © Cranfield University 2013. All rights reserved. No part of this publication may be reproduced without the written permission of the copyright owner. en_UK
dc.subject Aircraft Assembly en_UK
dc.subject Condition Based Maintenance en_UK
dc.subject Agent Based Simulation en_UK
dc.subject Multi-Objective Optimization en_UK
dc.title Simulation and Optimization of Integrated Maintenance Strategies for an Aircraft Assembly Process en_UK
dc.type Thesis or dissertation en_UK
dc.type.qualificationlevel Masters en_UK
dc.type.qualificationname MSc by Research en_UK


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search CERES


Browse

My Account

Statistics