The time to achieve peak output with special reference to aircraft production

Show simple item record

dc.contributor.author Stanley, P. J.
dc.date.accessioned 2012-05-15T15:05:26Z
dc.date.available 2012-05-15T15:05:26Z
dc.date.issued 1949-07
dc.identifier.uri http://dspace.lib.cranfield.ac.uk/handle/1826/7155
dc.description.abstract During the war, the rate of production which could be expected from an organisation setting out to manufacture a new type of aircraft was of great interest from the planning point of view. It was found that a time of the order of twelve to eighteen months elapsed between the delivery of the first production type and the achievement of the peak rate of production for which the factory was planned. This report analyses how this growth takes place and used the theoretical growth curve, known as the Logistics, for fitting smooth curves to a large amount of date from several countries. From the Logistic formula an index of the rate of growth for judging the relative performances in different projects has been evolved. Its use includes also the planning of production schedules. The factors determining the rate of growth are investigated but these would appear to be more in the intangible category rather than among the simple physical conditions such as size of programme or of aircraft. en_UK
dc.language.iso en en_UK
dc.publisher College of Aeronautics, Cranfield en_UK
dc.relation.ispartofseries College Report en_UK
dc.relation.ispartofseries 30 en_UK
dc.title The time to achieve peak output with special reference to aircraft production en_UK
dc.type Report en_UK


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search CERES


Browse

My Account

Statistics