CERES >

Browsing by Title

Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
or enter first few letters:   
Sort by: In order: Results/Page Authors/Record:
Showing results 3383 to 3402 of 7339
Issue DateTitleAuthor(s)
Aug-2010Improved water safety planning: insights into the role of organisational cultureSummerill, Corinna
2014An improved wavelet-ARIMA approach for forecasting metal pricesKriechbaumer, Thomas; Angus, Andrew; Parsons, David J.; Rivas Casado, Monica
2012The improvement of aluminium casting process control by application of the new CRIMSON processDai, Xiaojun J.; Jolly, Mark R.; Zeng, Binxu
2002Improvement of a tail-plane strucural model using vibration test data.Guo, Shijun J.
Oct-2004Improvement of cost estimating internal practice.Souchoroukov, Petros
2006Improvement of low-velocity impact and compression-after-impact performance by z-fibre pinning.Zhang, Xiang; Hounslow, L; Grassi, Marcello
Oct-2008The improvement of meter performance of EM sensing flowmeters using software modellingLim, Sungtaek
Dec-2008Improvement of runback water film calculation and its impact on ice predictionSoufflet, Yves
2010The improvement paradox in project contexts: A clue to the way forward?Brady, Tim; Maylor, Harvey
Sep-2010Improvements in electrochemical glucose biosensorsFragkou, Vasiliki
18-May-2011Improvements in electromagnetic assessment methodologies : bounding the errors in predictionWraight, A
29-Jun-2016Improvements in energy consumption and environmental impact by novel single shot melting process for castingSalonitis, Konstantinos; Jolly, Mark R.; Zeng, Binxu; Mehrabi, Hamid
Feb-1966Improvements in petrol engine performance with ultrasonic fuel atomisationNorster, E. R.
2007Improving bioaerosol exposure assessments 1 - comparative modelling of 2 emissions from different compost ages and activities.Taha, M. P. M.; Drew, Gillian H.; Tamer Vestlund, Asli; Hewings, G.; Jordinson, G. M.; Longhurst, Philip J.; Pollard, Simon J. T.
1989Improving business performance through capital disinvestmentAllen, Mike
2013Improving changeover time: a tailored SMED approach for welding cellsGuzmán, Ferradás P; Salonitis, Konstantinos
Sep-1999Improving construction design : The lean thinking paradigmMorris, Jonathan
Sep-2007Improving design coordination in computer supported environments in SMEs : implementation of a tool for capturing and analysing collaboration between actorsPol, Guillaume
Mar-2001Improving IS performance in organisations : towards an IS capabilityPeppard, J. W.
12-Feb-2015Improving mechanical properties of novel flax/tannin composites through different chemical treatmentsZhu, Jinchun; Zhu, Huijun; Immonen, K.; Brighton, James; Abhyankar, Hrushikesh
Showing results 3383 to 3402 of 7339