CERES
Library Services
  • Communities & Collections
  • Browse CERES
  • Library Staff Log In
    Have you forgotten your password?
  1. Home
  2. Browse by Author

Browsing by Author "Jenkins, Nicole"

Now showing 1 - 1 of 1
Results Per Page
Sort Options
  • Loading...
    Thumbnail Image
    ItemOpen Access
    Vertical flow wetlands for tertiary wastewater treatment
    (2017-04) Jenkins, Nicole; Jefferson, Bruce
    Due to increasing focus on improving water quality within surface waters, it is anticipated that stringent ammonia discharge consents will be introduced to small wastewater treatment works in the coming years, with potential discharge consents of as low as 1mgNH₄-N/L. This is likely to require upgrading of secondary treatment works to include a polishing treatment stage. Vertical flow wetlands (VFWs) are aerobic treatment processes, making them the ideal solution for achieving nitrification to within the proposed discharge consent, however current uses are limited to treatment of raw water and primary effluents. The potential for VFWs under tertiary application has not previously been identified. This study aims at addressing this knowledge gap by determining performance capabilities and hydraulic behaviours at both full and pilot scale, and defining the optimal operational strategies in terms of hydraulic loading, dosing frequency and resting periods using pilot plant trials. Findings from the study have shown VFWs to achieve effluent ammonia concentrations of as low as 0.002mgNH₄-N/L from influent concentrations of up to 7.4mgNH₄-N/L, with almost complete nitrification observed in most cases. Additional onsite sampling provided a performance comparison against existing tertiary treatments, showing potential for the VFWs to outperform in terms of solids organics and nutrient removal. Pilot plant operational trials revealed application of prolonged resting periods and frequency of daily dosing to have no significant impact on either the hydraulic stability or treatment performance for VFWs in tertiary application. Pilot plant trials determined an initial stabilisation period of between 2 to 3 years is required during the start up of a VFW system, with hydraulic loading rates being increased gradually over time to avoid occurrence of clogging. An economic assessment determined the feasibility of tertiary VFWs to be comparable to existing conventional tertiary treatments.

Quick Links

  • About our Libraries
  • Cranfield Research Support
  • Cranfield University

Useful Links

  • Accessibility Statement
  • CERES Takedown Policy

Contacts-TwitterFacebookInstagramBlogs

Cranfield Campus
Cranfield, MK43 0AL
United Kingdom
T: +44 (0) 1234 750111
  • Cranfield University at Shrivenham
  • Shrivenham, SN6 8LA
  • United Kingdom
  • Email us: researchsupport@cranfield.ac.uk for REF Compliance or Open Access queries

Cranfield University copyright © 2002-2025
Cookie settings | Privacy policy | End User Agreement | Send Feedback